Your new shed in as little as 14 working days*Made to order, delivered and professionally installed. *Subject to availability, location and order specification.
Help & guides
Free delivery & fitting in England & Wales Made to order, fitted by our own team
Everything you need to know before and after you order, from preparing your base to looking after your shed.
How ordering works
Choose your size, layout and range online, in the builder or on any shed page.
Add it to your basket and check out. Orders of £1,000 or more pay a 50% deposit, with the balance on the day it's fitted.
We call you to confirm your shed and talk through anything bespoke.
We give you a delivery and fitting date.
On the day, show our team your base and leave the rest to us.
Delivery & fitting
Delivery and fitting are free across England and Wales. Our own team delivers your shed and builds it on the same visit, so there are no third-party couriers or fitters.
We fit in Scotland too, for an extra 20% of the shed price. Enter your postcode on any shed page to check your area.
We need a clear route at least 7 ft high and 3 ft wide from the van to your base. If you have a narrow passage, tight turns or access through the house, send us photos or a short video before you order.
Preparing your base
Your shed needs a firm, flat, level and square base. Without one, a building can twist, doors stop closing properly and the timber deteriorates faster.
Paving slabs or a concrete pad are ideal. Concrete is more permanent and suits larger buildings; slabs are practical and cost-effective for smaller ones.
The base should be no smaller than the floor of your shed, and no more than a few inches bigger.
If you can, leave about 18 inches (45 cm) clear around the shed for fitting and future maintenance, and allow for the roof overhang.
Need a hand? Ask us about having a base laid, or ground screws as a quicker alternative to concrete.
Laying a slab base
Mark out the size of the base.
Compact the ground and add a layer of hardcore.
Add at least an inch of sand and cement (1 part cement to 4 parts sand) and roughly level it.
Lay the slabs, checking they're level in every direction as you go.
Planning permission
Most garden sheds don't need planning permission. As a rule, a shed counts as permitted development if it's single storey, isn't in front of your house and covers no more than half your garden.
Height limits apply: 2.5 m overall if it's within 2 m of a boundary, otherwise up to 4 m with an apex roof or 3 m with any other roof, and 2.5 m to the eaves.
Different rules apply to listed buildings, conservation areas and other protected land. If in doubt, check with your local council before you order.
Dip treated or tanalised?
Every Beast Sheds framework is pressure treated, whichever range you choose. The difference is the cladding.
Dip treatment coats the surface of the timber with preservative. It gives good initial protection at a lower price, but needs treating regularly to keep it protected. That's our Classic range.
Tanalising forces preservative deep into the timber under vacuum and pressure, for much longer-lasting protection against rot and insects. Tanalised and Beast sheds come with a 10-year anti-rot guarantee.
Guarantees
6-month manufacturing warranty on every building.
10-year anti-rot guarantee on Tanalised and Beast timber.
No timber guarantee on Classic (dip-treated) timber.
Roof: 10 years on 40 kg mineral felt, 15 years on Onduline.
To keep your guarantee valid, the shed must stand on a suitable base, be treated when it's built and every 12 months after, and not be modified or placed against a wall that lets moisture through.
Wood is a natural material and moves with the weather. Small splits and movement are normal and don't affect the strength of your shed. Guarantees cover UK domestic use and don't affect your statutory rights.
Looking after your shed
Treat the outside timber when your shed is built and once a year after that. Our 2.5 L wood protector adds colour and water-repellent protection.
Keep the base and the ground around it clear so water can drain away and air can move under the floor.
Check the roof covering each year, especially after storms.
Still stuck? Call us on 0800 170 1434 and talk to the team that builds your shed.
Do I need planning permission?
Usually not. Most garden sheds fall under permitted development, but within 2 m of a boundary the building must be no taller than 2.5 m. The builder shows your ridge height as you design and flags it if you go over. Listed buildings and conservation areas have stricter rules, so check with your council.
What base does my shed need?
A flat, level concrete or paving slab base at least the size of the shed's footprint. A level timber-frame base can sometimes work too: call us before you order and we'll check it. The size step shows the exact base size for your build, and our base guide in Help & guides explains how to lay one.
How long does it take?
Every shed is made to order in our own workshop. You'll see the earliest fitting week for your postcode before you pay.
When do I pay?
Orders over £1,000 take a 50% deposit before we make your shed. The balance is paid on the day it's fitted, by card or cash.
Can I change my build after ordering?
Yes, until it goes into production. We check every design before it's made and will call you if anything won't work.
Do you deliver and fit in Scotland?
Yes. Delivery and fitting are free in England and Wales. In Scotland, fitting adds 20% to the price of your shed.
What guarantees come with my shed?
Every shed has a 6-month manufacturing warranty. Tanalised and Beast timber carry a 10-year anti-rot guarantee (Classic timber has no timber guarantee). Roofs are guaranteed for 10 years on felt and 15 years on Onduline.
Can I have a size that isn't listed?
Yes. Choose "Custom" to set any size from 4×4 to 30×14 ft, or call us about bespoke builds.